Offices Nationwide

Reverberation Time
The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination...more

Sound Transmissions
Paths can be interrupted by insulation and blocking air paths. A material's insulation is governed by mass, stiffening and damping...more
Part F
Means of Ventilation

Fakenham - On Construction EPC - 01733 600 149
The office that covers this area is: Peterborough
Phone Number: 01733 600 149 Email: fakenham@e2consultants.co.uk
Our other services include:
On Construction EPC can also be known as:
New Build On Construction Domestic EPC, Predicted Energy Assessment, PEA, Domestic On Construction EPC, New Build EPC, New Build Domestic EPC, New Build On Construction EPC,


Copyright 2025 E2 Specialist Consultants Limited
Company No. 06728970