Offices Nationwide 

How loud is too loud?

Continued exposure to noise above 85 dBA (adjusted decibels) over time will cause hearing loss. The volume (dBA) and the length of exposure to the sound will tell you how harmful the noise is.

In general, the louder the noise, the less time required before hearing loss will occur.

Air Testing & Leakage

We can offer additional services at discounted rates along side our tests! These are Sound Testing and Part F. Ask our Consultants for more

Reverberation Time

The ‘reverberation time’ of a space changes the way the space ‘sounds’ and can affect the intelligibility acoustic information. A high reverberation time can make a room sound muffled, loud and noisy. Rooms designed for speech typically have a low reverberation time, whereas a higher reverberation time can add depth, richness and warmth to music.

The reverberation time of a room is defined as the time it takes for sound to decay by 60 dB after an abrupt termination. It is linked to the total quantity of soft treatments and the volume of the room.

Noise Disturbance

Building acoustics can help to mitigate the effects of noise disturbance which can have negative effects on health, well-being and general quality of life.

The Noise Policy Statement for England (NPSE) defines noise pollution as:

- Environmental noise: which includes noise from transportation sources. - Neighbour noise: which includes noise from inside and outside buildings. - Neighbourhood noise: which includes noise arising from industrial and entertainment premises, trade and businesses, construction sites and noise in the street.

This can be an important consideration for the location, design and construction of new developments.


Warning: mysqli::__construct(): (HY000/1203): User elite_user already has more than 'max_user_connections' active connections in /data05/elite/public_html/page_top_test.php on line 162

Warning: mysqli::select_db(): Couldn't fetch mysqli in /data05/elite/public_html/page_top_test.php on line 163
E2 Specialist Consultants
January 1 at 12:00am

Warning: mysqli::__construct(): (HY000/1203): User elite_user already has more than 'max_user_connections' active connections in /data05/elite/public_html/page_top_test.php on line 162

Warning: mysqli::select_db(): Couldn't fetch mysqli in /data05/elite/public_html/page_top_test.php on line 163

E2 Consultants Delivering compliance solutions for Architects & Developers    Head Office E2 HOUSE, South Park Way, Wakefield 41 Business Park, WF2 0XJ    Questions? Call: 0800 043 8100

»
»
22 37 26 28